The information provided below is intended to assist installers on the recommended approach to the installation of FORTIS Bolt Couplers on site. This information is provided as a guide only and all information on this page should be read thoroughly and well understood prior to commencing installation. If further guidance is required or if anything is unclear, the STRYPE team may be contacted for further assistance.
A printable PDF of the FORTIS Bolt Coupler Installation Guide can be downloaded below.

Remove the FORTIS Bolt Coupler from the packaging.

Partially unscrew all bolts anti-clockwise (as required) to allow unobstructed access of the bars into the FORTIS Bolt Coupler. Do not remove the bolts completely.

Gently slide the FORTIS Bolt Coupler over Bar 1 until the bar is flush with the centre pin. If it will not be possible to install Bar 2 once the bolts of Bar 1 have been hand-tightened, skip to step 12 of this installation guide.

On the Bar 1 half of the FORTIS Bolt Coupler, hand-tighten the bolts in sequence (1,2,3,4 etc) by rotating them clockwise. Start with the centre-most bolt (i.e: bolt 1 above), then work progressively outward towards the end of the coupler where Bar 1 was inserted. Hand-tighten the bolts only. Do not apply torque at this stage.

Gently insert Bar 2 into the FORTIS Bolt Coupler until the bar is flush with the centre pin.

Repeat step 4 for the remaining bolts.

Review the alignment of Bar 1 and 2 and ensure that the FORTIS Bolt Coupler is oriented to allow clear access for your chosen tooling. Adjust the alignment of both bars and the FORTIS Bolt Coupler as required.

On the Bar 1 half of the FORTIS Bolt Coupler, torque the bolts in sequence (1,2,3,4 etc) by rotating them clockwise using a suitable hand wrench, torque wrench or nut runner (as deemed necessary). Start with the centre-most bolt (i.e: bolt 1 above), then work progressively outward towards the end of the coupler where Bar 1 was inserted. Fully tighten each bolt until the heads of the bolts shear off. Bolt heads will shear off once the required torque has been applied.

Repeat step 8 for the remaining bolts.

Recycle or otherwise dispose of the bolt heads responsibly.

The installation of the FORTIS Bolt Coupler is complete. Steps 12-17 are only applicable for installations where it will not be possible to install Bar 2 once the bolts of Bar 1 have been hand-tightened.

Where it will not be possible to install Bar 2 once the bolts of Bar 1 have been hand-tightened, insert a suitably sized flat blade screwdriver (or other lever) into the FORTIS Bolt Coupler and gently pry the centre pin outwards from the body of the FORTIS Bolt Coupler. Do not remove the pin completely.

Align the end of Bar 2 with the end of Bar 1, allowing only a small gap to accommodate the centre pin.

Slide the FORTIS Bolt Coupler over Bar 2 until the centre pin is positioned directly where Bar 1 and 2 meet.

Gently press the centre pin back into the FORTIS Bolt Coupler. This will ensure that each bar is adequately inserted into the FORTIS Bolt Coupler.

Manipulate both bars and the FORTIS Bolt Coupler (as required) to ensure that each bar is in contact with the centre pin and that the bars are aligned for the applicable installation.

Complete step 4, then 6-10 to complete the installation.

.jpg/:/cr=t:28.58%25,l:21.18%25,w:56.18%25,h:42.04%25/rs=w:515,h:234,cg:true,m)
Welcome to STRYPE.
We have just launched our new website and we hope you love it as much as we do. If you have any trouble navigating the website, we would love you to share this feedback with us so that we may further enhance your experience.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.